a widened hallway, with its brand new wall moved outward
(on the left).

the remodel of the downstairs area has so far been the biggest challenge in my opinion. it took a very long time to conclude and included jobs like opening up the subfloor and digging / flattening some dirt to prepare for an even floor, widening of a dark and very narrow, low ceiling hallway, enlarging the bathroom using the area under our entry steps, and adding a brand new shower with curved walls so it would take up as little space as possible. there used to be a huge level difference between the hallway and the bedroom here with about three clunky stairs which we of course had to fix as well. we will post before and after pictures as well. thank you cj and tj for the remodeling help; --beautiful work!!