| I don't think anyone is thinking we are rushing through the remodeling of this house. 2 years after we removed the old, unsafe decks from the house, we started the rebuild project. |
![]() |
| Foundation for a storage area under the lower deck being poured one morning. |
![]() |
| Storage under the lower deck shaping up. |
![]() |
| The new storage!! |
![]() |
| Here's the frame for the staircase to connect upper and lower decks... |
![]() |
| I walked to the backyard to take this pix; the house indeed looks larger, much more complex but what an exciting change! |
![]() |
| From the kids bedroom, one can already enjoy a great, new view. Slider doors were still blocked with large plywood sheets at this point. |
![]() |
| Working on the railings, and frames for the glass panels. |
![]() |
| Our slider doors were still blocked but we could not wait to go outside! |
![]() |
| The new stairs connecting the upper and lower decks are beautiful, clean blocks. |